The Guadalupe Water Valve and ADA Ramp Replacement project was done it preparation for the 2017 Pavement Rehabilitation Project.  This project removed and replaced 30 ADA curb ramps that did not meet current regulations.  The project also replaced 12 aging water valves.  The 2017 Pavement Rehabilitation Project was to be a pulverization project.  We want to make sure that all of the infrastructure was in good condition before rehabilitation the street surface.